Resource · 6 min read
Custom Home Building Checklist
Building a custom home involves dozens of decisions and hundreds of steps. This checklist helps Roanoke Valley families track the process from first conversation through move-in day.
Phase 1: Planning and Site Selection
Before breaking ground, lay the foundation of decisions that will shape the entire project.
- Define your budget, including land, construction, and a 10–15% contingency
- Select and purchase your lot (or identify candidate lots)
- Evaluate lot for soil conditions, topography, utilities, and setbacks
- Select a licensed general contractor with local experience
- Begin floor plan selection and customization
- Review HOA restrictions if applicable
- Arrange construction financing
Phase 2: Design and Pre-Construction
The design phase establishes exactly what will be built before permits are pulled.
- Finalize floor plan with your builder
- Make exterior selections: siding, roofing, windows, doors
- Complete structural and MEP (mechanical, electrical, plumbing) drawings
- Submit plans for permit review
- Review and approve construction contract
- Establish a selection schedule for interior finishes
- Order long-lead items (custom cabinetry, windows, specialty items)
Phase 3: Site Work and Foundation
The first physical work on your home.
- Site clearing and grading
- Erosion and sediment control installation
- Excavation for foundation
- Footings poured and inspected
- Foundation walls (block or poured concrete)
- Waterproofing and drainage at foundation
- Backfill and rough grading
Phase 4: Framing and Rough-Ins
This phase is when the house takes visible shape.
- Floor system and subfloor
- Wall framing and bearing walls
- Roof framing and sheathing
- Rough roofing (ice/water shield, felt, starter shingles)
- Window and exterior door rough openings
- Rough electrical, plumbing, and HVAC
- Rough inspections before closing walls
Phase 5: Exterior and Interior Finishes
The long stretch of finishes that transforms a shell into a home.
- Exterior siding and trim
- Final roofing
- Insulation (post rough-in inspections)
- Drywall hang, tape, and finish
- Interior doors, trim, and millwork
- Cabinetry installation
- Flooring installation
- Tile work
- Paint
- Fixture and hardware installation
Phase 6: Mechanical Finals and Completion
Final mechanical systems, inspections, and punch-list.
- Final electrical and lighting
- Final plumbing fixtures
- HVAC equipment installation and startup
- Final inspections and certificate of occupancy
- Walk-through and punch list
- Final cleaning
- Key handover and move-in
Ready to start your project?
Baron Enterprises has served the Roanoke Valley since 1998. Call (540) 989-7646 or contact us online.
Get a Free QuoteReady to build something
remarkable?
Whether you're dreaming of a custom home or transforming your existing space, the process begins with a single conversation. Let’s talk about your vision.